Friday, November 15, 2013
We Got Water, We Got Walls....
Morning! We have water at a rate of 30 gallons a minute, but Ray can't remember how far the drill had to go. I'll post once I know. And the "precision wall" forms were taken off yesterday since the concrete was dry enough. But here's a photo of the walls with the forms still in place:
When I got back to the farm yesterday, Ray and his crew were busy installing the foundation plumbing pipes (have I got that right?) because the inspector is due today. This photo shows the piping, as well as the two windows in one of the downstairs bedrooms. The big black flexible pipe is for radon, which Ray says he puts in all the houses he builds (as a "just in case").
And here's a photo of Ray, the builder, looking through the studio window:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment